Siemens NXAIR M Operating Instructions Manual page 98

Air-insulated switchgear
Table of Contents

Advertisement

Operating the circuit-breaker panel with HV HRC fuse
Fig. 159: Pushing front insulation cover into the housing
Proceed in the same way with the HV HRC fuse-links of the other phases.
Fig. 160: The HV HRC fuse-links replaced

The HV HRC fuse-links have been replaced.
98
HINT
Final procedure
Insert the withdrawable part in the panel and de-earth the feeder. After
closing the high-voltage door, the panel can be integrated into the course
of operation again.
NXAIR M
139-2021.9 / 07

Advertisement

Table of Contents
loading

This manual is also suitable for:

139-2021.9

Table of Contents