Commissioning; Software; Preparation; Assigning A Physical Address - ABB tacteo KNX Product Manual

Room outdoor sensor
Table of Contents

Advertisement

7

Commissioning

7.1

Software

To start the device a physical address must be assigned first. The physical address is assigned
and the parameters are set with the Engineering Tool Software (ETS).
NOTE
The devices are products of the KNX system and meet KNX guidelines. Detailed
expert knowledge by means of KNX training sessions for a better understanding
is assumed.
7.1.1

Preparation

1. Connect a PC to the KNX bus line via the KNX interface (e.g. via the commissioning
interface / commissioning adapter 6149/21-500).
The Engineering Tool Software must be installed on the PC (native application from
ETS 4.0).
2. Switch on the bus voltage.
7.1.2

Assigning a physical address

1
Fig. 12:
Programming button
Product manual 2CKA001473B9488
1. Press the programming button [1].
2
Commissioning
All LEDs [2] light up red.
│26

Advertisement

Table of Contents
loading

This manual is also suitable for:

I-bus knx

Table of Contents