FusionModule1000A20 Prefabricated All-in-One
Data Center
Commissioning Guide

4.2 Reference Document

Table 4-2 Required documentation
Item
Prefabricated all-in-one data center
AC/DC power system
ECC800
NetEco

4.3 Commissioning Personnel Skill Requirements

Below table describes the skill requirements for the FusionModule1000
commissioning personnel.
Issue 03 (2022-12-15)
NO TE
● This table may not list some tools required at specific sites. Onsite installation personnel
and technical support personnel should prepare tools based on site requirements.
● Some dedicated tools and installation materials provided with the equipment may not
be listed in this table.
NO TE
The ECC800/NetEco version depends on the version in use. Click
NetEco WebUI to obtain the current version.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Preparations for Power-On Commissioning
Document Name
FusionModule1000A20 Prefabricated
All-in-One Data Center V200R003C10
Initial Configuration Parameter
Manual
TP48200B-N20B2, TP48200B-N20B3,
TP48200B-L20B2, TP48400B-N20B3,
TP48400B-L20B1 Indoor Power System
Installation Guide
TP48600B-N20B1 Indoor Power Supply
Installation Guide
TP482000B V300R002C03 Central
Office Power System Installation Guide
(TP482000B-N20B1,TP482000B-
N20B2,TP481200B-N20B1 and
TP481200B-N20B2)
ECC800 Data Center Controller
V100R003C00 User Manual
ECC800 V100R001 Alarm Reference
iManager NetEco Product
Documentation-(V600R008C20)
on the ECC800/
27