Step 3 Check that the Run indicators on PSUs are steady on.
Step 4 Measure the voltage between the −48 V busbar and RTN+ busbar. Ensure that the
voltage is in the range of −42 V DC to −58 V DC.
Step 5 Power on the TP48600B, and view and complete its initial configuration.
● During the TP48600B commissioning process, modify the initial configuration
parameters by referring to the power supply and distribution device initial
configuration table.
● If any alarm is raised, rectify the fault before continuing the commissioning.
Step 6 Set parameters such as Battery n connected, Rated capacity, and Installation Time.
Table 9-4 Setting battery parameters
Main
Menu
Parameters
Settings
Issue 03 (2022-12-15)
NO TICE
NO TE
Set the voltage test mode if the cable for monitoring single battery voltage is configured.
Second
-Level
Menu
Battery
Copyright © Huawei Digital Power Technologies Co., Ltd.
Third-
Fourt
Default
Level
h-
Value
Menu
Level
Menu
Basic
Batter
Yes
Parame
y n
ters
conne
cted
Rated
190 Ah
capaci
ty
Other
Install
N/A
Parame
ation
ters
Time
9 Commissioning Core Components
Setting
Remarks
Yes/No
If n battery
strings are
connected, set
Battery1
Connected to
Battery N
Connected to
Yes, and set the
other parameters
to No.
Rated
The batteries
capacit
controlled by one
y of
circuit breaker or
each
fuse are called a
battery
battery string.
string
Current
N/A
time
64

Advertisement

Table of Contents
loading

Table of Contents