Table 9-11 NetEco parameters
Path
System
Settings >
NMS
Application
> NetEco >
Communicat
ion
Parameters
Step 4 Set site configuration parameters on the ECC800 WebUI.
Table 9-12 Site Configuration parameters
Path
System
Settings >
System
Parameters
> Site
Configuratio
n
----End

?.2. Creating the ECC800 Collector on the NetEco

Prerequisites
Procedure
Step 1 Choose System > Configuration Management > Data Center Planning from the
main menu. The Data Center Planning window is displayed.
Issue 03 (2022-12-15)
Parameter
Server IP
Port number
Link to the
monitoring
IP address
Parameter
Smart
module
name
System Type
You have logged in to the NetEco client by web browser.
You have created a modular or container in Data Center Planning. For
detailed operations, see Creating a Domain.
The IP address of the NetEco connected has been configured on the ECC800
WebUI.
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 Commissioning Core Components
Default
Setting Value
Value
192.168.8.
IP address of the primary NetEco
11
server
NOTE
The NetEco IP address and the ECC800
IP address must be configured in the
same network to ensure normal
connection between the NetEco and
the ECC800.
31220
31220
WAN_1
WAN_1
Default
Setting Value
Value
FusionMo
Sets the user-defined smart module
dule
name.
FusionMo
Set the required system type.
dule2000