Table 6-2 Checking after power-on
System
Managem
ent system
Issue 03 (2022-12-15)
Check
Item
DC power
system
(TP48400B
/
TP48600B/
TP481200B
)
Intelligent
heat
exchanger/
Fresh air
integrated
unit
Check
Item
Monitoring
devices
Copyright © Huawei Digital Power Technologies Co., Ltd.
Check
Check Standard
Item
Indicator
All indicators, including the three-phase
s
indicators (yellow for L1, green for L2,
and red for L3), are steady on and in
correct status.
Surge
● The SPD circuit breaker is switched on.
protectiv
● The SPD indication windows are
e device
green.
(SPD)
● The SPD signal terminals are normally
closed.
Monitori
● The screen is free from erratic display
ng Unit
or missing characters, and displays no
alarm. If there are any alarms, record
the alarms and handle them.
● The RUN indicator of the rectifier is
on, and the alarm indicator is off.
Controlle
The screen is free from erratic display or
r
missing characters, and displays no
alarm.
Check
Check Standard
Item
Camera
The red indicator inside the camera is on.
ECC800
The Power indicator on the main control
collector
board is on.
Smart
The PWR and RUN indicators are on.
ETH
gateway
ETH
The PWR, RUN, and ALM indicators are
converter
on.
T/H
The PWR, RUN, and ALM indicators are
sensor
on.