1.
2.
3.
Step 5 Register with the OCX plug-in.
Restart Internet Explorer and enter the IP address to be accessed by the client. The
page for watching videos is displayed. Click Install according to the prompt
message. After the OCX plug-in is installed, you can watch the videos. If videos are
not displayed, contact Huawei technical support.
Step 6 If the OCX plug-in needs to be registered on the client again, perform the
following operations to uninstall the OCX plug-in and then re-install it:
1.
2.
Issue 03 (2022-12-15)
Choose Trusted sites > From definition rank. The Security setting – trusted
stand region dialog box is displayed, as shown in
Figure 9-26 Security setting – trusted stand region
Enable the following options and then click Ok.
Script ActiveX controls marked safe for scripting
Initialize and script ActiveX controls not marked as safe
Download unsigned ActiveX controls
Download signed ActiveX controls
A dialog box is displayed, indicating Does the determination need to
change the establishment of this region?. Click Yes.
NO TE
If it is the first time to install the plug, you need to wait about 10 to 20 seconds.
Close Internet Explorer.
Find C disk directory folder exists eSDK_IVS folder, right-click to select Delete.
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 Commissioning Core Components
Figure
9-26.