Commissioning Guide
Preparations
Tools required: multimeter, Phillips screwdriver, flat-head screwdriver, step ladder,
insulation megohmmeter, and pressure gauge
Document required: initial configuration parameter manual
Skill requirement: power distribution engineer
Checking Before Power-On
Below table lists the items to be checked for the FusionModule1000 before power-
on.