Checking Before Power-On - Huawei FusionModule1000A20 Commissioning Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One
Data Center
Commissioning Guide
Preparations
Tools required: multimeter, Phillips screwdriver, flat-head screwdriver, step ladder,
insulation megohmmeter, and pressure gauge
Document required: initial configuration parameter manual
Skill requirement: power distribution engineer

Checking Before Power-On

Below table lists the items to be checked for the FusionModule1000 before power-
on.
Issue 03 (2022-12-15)
5
Checking Before Power-On
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Checking Before Power-On