Step 8 Set the ATS controller to auto mode.
----End

9.1.1.2 Commissioning the PD510 Electricity Meter

Prerequisites
You have powered on the power distribution equipment where the PD510
electricity meter is installed.
Issue 03 (2022-12-15)
The following table lists the system configuration attributes and values.
Table 9-2 System configuration attributes and values
Item
Voltage
Volt Threshold
Thresholds
Min LN1
Volt Threshold
Min LN2
Volt Threshold
Max LN1
Volt Threshold
Max LN2
Frequency
Freq Threshold
Thresholds
Min LN1
Freq Threshold
Min LN2
Freq Threshold
Max LN1
Freq Threshold
Max LN2
Modbus
Language
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 Commissioning Core Components
Value
Description
–30% to –5%
The step increase
is ±1%. The
default settings
–30% to –5%
are –10% for
LN1 and LN2.
+5% to +30%
The step increase
is ±1%. The
default settings
+5% to +30%
are +10% for
LN1 and LN2.
–10% to –1%
The step increase
is ±1%. The
default settings
–10% to –1%
are -5% for LN1
and LN2.
+1% to +10%
The step increase
is ±1%. The
default settings
+1% to +10%
are +5% for LN1
and LN2.
– Modbus
There is no need
address
to reset the
parameter.
– Local /
Remote
English; Deutsch;
Set the
Francais;
parameter based
Itatiano; Espanol;
on site
Suomi; Russian;
requirements.
Chinese
59