Genset-Grid Hybrid Scenario - Huawei iSitePower-M User Manual

Hide thumbs Also See for iSitePower-M:
Table of Contents

Advertisement

iSitePower-M (MAP05A1, MAB05B1)
User Manual
Figure 5-4 Grid scenario network diagram (multiple products connected in
parallel)
In the grid scenario, the power system works circularly as follows. The power
source preference sequence is grid > battery.
1.
2.

5.3 Genset-Grid Hybrid Scenario

Figure 5-5 Genset-grid hybrid scenario network diagram (one product)
Issue 02 (2021-12-30)
If grid power is available, grid power is supplied to loads and charges
batteries if batteries are not fully charged.
If grid power is unavailable, batteries supply power to loads.
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Application Scenarios
36

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents