In the solar-grid hybrid scenario, the power system works circularly as follows. The
power source preference sequence is solar power > grid > battery.
1.
2.
3.
4.
5.

5.5 Solar-Genset Hybrid Scenario

Figure 5-9 Solar-genset hybrid scenario network diagram (one product)
Issue 02 (2021-12-30)
If both solar power and grid power are available and batteries are fully
charged, solar power is preferentially supplied to loads. If solar power is
insufficient, both solar power and battery power are supplied to loads.
If both solar power and grid power are available, the grid power is supplied to
loads and solar power charges batteries when batteries discharge to the cut-
off capacity.
When solar power is available but grid power is unavailable, if solar power is
sufficient, it is supplied to loads and charges batteries; if solar power is
insufficient, solar power and batteries power loads at the same time.
When solar power is unavailable but grid power is available, grid power is
supplied to loads and charges batteries.
When solar power and grid power are unavailable, batteries supply power to
loads.
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Application Scenarios
38

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents