Huawei iSitePower-M User Manual page 75

Hide thumbs Also See for iSitePower-M:
Table of Contents

Advertisement

iSitePower-M (MAP05A1, MAB05B1)
User Manual
Procedure
Step 1 Remove the waterproof gland from the communications terminal of a battery
module.
Step 2 Remove the locking cap and waterproof rubber plug from the communications
terminal housing.
Step 3 Install communications cables for the battery module.
Step 4 Lock the communications terminal waterproof gland.
Step 5 Reinstall the waterproof rubber plug.
Step 6 Tighten the locking cap and secure the signal cables using cable clips.
Step 7 Install communications cables for other battery modules in sequence.
Figure 7-13 Installing battery signal cables (standard scenario)
Issue 02 (2021-12-30)
Copyright © Huawei Digital Power Technologies Co., Ltd.
7 Electrical Connection
70

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents