Optional) Installing Battery Modules For Capacity Expansion - Huawei iSitePower-M User Manual

Hide thumbs Also See for iSitePower-M:
Table of Contents

Advertisement

iSitePower-M (MAP05A1, MAB05B1)
User Manual
----End
Table 6-1 DIP switch address
Scenario
Single
Parallel
Master
Slave 1
Slave 2
6.4 (Optional) Installing Battery Modules for Capacity
Expansion
● A maximum of three battery modules can be installed on a bracket or base. If
● For details about how to install brackets and modules, see
Step 1 Remove the L-shaped plates from the top cover, rotate them by 180 degrees, and
install them back on the top cover.
Issue 02 (2021-12-30)
DIP Switch
Pin 1 (M/S)
Address
1
ON
1
ON
2
OFF
3
OFF
NO TICE
more than three battery modules are required, add a bracket.
Mounting Bracket
and
Copyright © Huawei Digital Power Technologies Co., Ltd.
Pin 2 (A)
OFF
OFF
ON
OFF
6.3 Installing
Modules.
6 System Installation
Pin 3 (B)
Pin 4 (C)
OFF
OFF
OFF
OFF
OFF
OFF
ON
OFF
6.2 Installing a
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents