Section 11
Testing functionality by secondary injection
Vpickup
ANSIEQUATION2427 V1 EN-US
4.
Decrease the voltage slowly and note the reset value.
5.
Set and apply about 20% higher voltage than the measured trip value for one phase.
6.
Measure the time delay for the TRST1 signal and compare it with the set value.
7.
Check the inverse time delay by injecting a voltage corresponding to 1.2 × Vpickup>.
8.
Repeat the test to check the inverse time characteristic at different over-voltage levels.
9.
Repeat the above described steps for Step 2 of the function.
11.6.2.2
Extended testing
1.
The tests above can be repeated for 2 out of 3 and for 3 out of 3 operation mode.
11.6.2.3
Completing the test
Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
11.6.3
Two step residual overvoltage protection ROV2PTOV (59N)
Prepare the IED for verification of settings outlined in Section
11.6.3.1
Function revision history
Document
revision
A
B
C
D
E
F
H
J
L
M
11.6.3.2
Verifying the settings
182
>
VT
sec
´
´
VBase
100
VTprim
Product
History
revision
2.2.1
-
2.2.1
-
2.2.2
-
2.2.3
-
2.2.3
-
2.2.4
-
2.2.4
-
2.2.5
-
2.2.6
-
2.2.6
-
© 2017 - 2023 Hitachi Energy. All rights reserved
1MRK506371-UUS Rev. M
GUID-BE4B4A36-CCEE-4020-B7DC-6A83A43D11F5 v2
"Preparing the IED to verify
GUID-22110E0B-DEFB-461F-A437-4D221DB88799 v3
Line distance protection REL670
Commissioning manual
(Equation 98)
M13806-43 v6
SEMOD54358-3 v7
settings".
SEMOD54358-35 v11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rel670

Table of Contents