Hitachi Relion 670 Series Commissioning Manual page 74

Line distance protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Section 9
Establishing connection and verifying the IEEE C37.118/1344 communication
IEC140000139 V1 EN-US
Figure 11:
Open the drop-down menu in the Command field. There is a list of commands that can be sent from
the client (PMU Connection Tester) to the PMU. Try different commands and make sure that the
PMU is receiving and responding to them.
68
Graphic view over streaming synchrophasor data
© 2017 - 2023 Hitachi Energy. All rights reserved
1MRK506371-UUS Rev. M
IEC140000139-1-en.vsd
Line distance protection REL670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rel670

Table of Contents