Section 11
Testing functionality by secondary injection
11.17.1.2
Completing the test
Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
11.18
Exit test mode
The following procedure is used to return to normal operation.
1.
Navigate to the test mode folder.
2.
Change the Enable setting to Disable. Press the 'E' key and the left arrow key.
3.
Answer YES, press the 'E' key and exit the menus.
252
After exiting the IED test mode, make sure that the MU is returned to normal mode.