Charging Cable Gland - Siemens SICHARGE D Operating Instructions Manual

Hide thumbs Also See for SICHARGE D:
Table of Contents

Advertisement

1. Use a suitable key/tool to open the locks of the cover plate.
2. Remove the cover plate
3. Remove the 4 screws of the fan plate with a TX 30 screwdriver
4. Remove the plate with the fan
5. Lock the fan
6. Remove the 2 nuts and washers with a 10 mm open-end wrench
7. Remove the cabinet with the filter mat
8. Remove the filter mat
Insert the new filter mat with the marking facing out in the reverse order.
9.3.4

Charging cable gland

The proper attachment of the charging cables to the charging station can change due to
temperature fluctuations and impermissible tensile loads. Therefore, check the cable glands
for tightness with a maximum tightening torque of 30 Nm. Refer to the following table for
the wrench sizes for the cable glands of your charging station:
Table 9-1  Required tools
Charging cable
125 A CHAdeMO
200 A CHAdeMO
250 A / 400 A (peak) CCS
500 A CCS
SICHARGE D
Operating Instructions, 11/2023, A5E50556539-AG
Maintenance and service
9.3 Servicing the charging station
Width across flats
SW45
SW57
SW45
SW57
131

Advertisement

Table of Contents
loading

This manual is also suitable for:

8em5907-0aa00-1aa7.06

Table of Contents