JUPITER-(3000K, 6000K, 9000K)-H1 Smart
Transformer Station
User Manual
6.2.2 Powering Off the Transformer for Overhaul (Lower
Isolation Structure of the Ring Main Unit, DQS and 8DJH)
Figure 6-3 Running status before overhaul
Procedure
Step 1 Remotely turn off the ACB in LV PANEL A.
Step 2 Remotely turn off the ACB in LV PANEL B.
Step 3 Remotely turn off the circuit breaker of cabinet G2 in the ring main unit.
Step 4 Manually turn off the disconnector of cabinet G2 in the ring main unit.
Step 5 Manually turn on the ground knife switch of cabinet G2 and lock the operation
hole. Install a sign to forbid any operation.
Issue 02 (2023-09-30)
Copyright © Huawei Technologies Co., Ltd.
6 System Maintenance
100