JUPITER-(3000K, 6000K, 9000K)-H1 Smart
Transformer Station
User Manual
Figure 2-17 Appearance
(1) Operation holes of
grounding switches
(4) Cable connectors
2.4.4.2 DQS-12/24 (DVC)
Issue 02 (2023-09-30)
NO TE
No cable connector is installed in cabinet G1 or G3. The cable connectors in the figure are
for reference only. The actual position and dimensions may vary.
Copyright © Huawei Technologies Co., Ltd.
(2) Load switch operation
holes
(5) Cable clips
2 Product Description
(3) Isolation switch operation
hole
(6) Ground bar
33