Temporary Work Volume (Sdpv) Creation; Figure 5.11 Temporary Work Volume (Sdpv) Creation - Fujitsu ETERNUS DX200 S3 Configuration Manual

Disk storage system
Hide thumbs Also See for ETERNUS DX200 S3:
Table of Contents

Advertisement

Chapter 5
General Settings
5.7
RAID Configuration Settings
*2: If "7" is specified for the number of volumes, sdv0, sdv1, sdv2, sdv3, sdv4, sdv5, and sdv6 volumes
are created.
A confirmation screen appears.
4
Click the [OK] button.
The volume is created and the registration completion screen appears.
5
Click the [Done] button.
The screen display returns to the [Volume] screen.
5.7.4

Temporary Work Volume (SDPV) Creation

Create a temporary work volume in the backup RAID group.
Create a volume as an expansion area of SDV in the backup RAID group "RG1" created in
Creation" (page

Figure 5.11 Temporary Work Volume (SDPV) Creation

Backup RAID group (RG1)
2TB
2TB
RAID5 (2+1)
FUJITSU Storage ETERNUS DX100 S3/DX200 S3 Disk storage system Configuration Guide (Basic)
88).
2TB
Copyright 2014 FUJITSU LIMITED
Temporary work volume
500GB
sdpv
(Snap Data Pool Volume)
95
"5.7.1 RAID Group
P3AM-7652-02ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx100 s3

Table of Contents