Figure 3-38 Enc82S-Dual Bottle Rack Installation - ABB NGC8206 User Manual

Chromatograph
Hide thumbs Also See for NGC8206:
Table of Contents

Advertisement

Figure 3-37
Insert Bolt through split
and flat washer. Feed
through stand mounting
holes into nut.
Figure 3-38 ENC82S–Dual Bottle Rack Installation
8) Install carrier gas bottle in bottle rack.
9) Using chains, strap the bottle(s) to the rack by attaching a bolt snap to one of the
center chains.
2101510 Rev. AG
Large Environmental Enclosure
Back Side
Bracket
ENC82L–Dual Bottle Rack Installation
Bottle Rack Option
P/N: 2101076
Note: This option mounts to the side of
the stand and not to the Enclosure
Page 3–37

Advertisement

Table of Contents
loading

Table of Contents