Calibration Gas Regulator Installation; Materials; Instructions; Figure 3-42 Calibration Bottle Location - ABB NGC8206 User Manual

Chromatograph
Hide thumbs Also See for NGC8206:
Table of Contents

Advertisement

CALIBRATION BLEND BOTTLE
CYLINDER: M009
FITTINGS: CGA180

3.22 Calibration Gas Regulator Installation

The following instructions are valid for all installations.

3.22.1 Materials

Calibration blend regulator assembly with low pressure switch (see
Installed calibration gas bottle

3.22.2 Instructions

1) Remove the protective cap from the high pressure inlet, if required.
2) Insert the ferrule on the regulator high pressure inlet into the calibration gas
bottle outlet.
3) Screw the nut onto the thread and tighten.
4) Check for leaks.
5) Remove the J2 field wiring connector from the NGC termination panel located
inside the rear of the main enclosure (see
6) Using a small flat blade screw driver, loosen DI2 pins 3 and 4.
7) Insert the red wire into the (+) terminal (pin 3).
8) Retighten pin 3.
2101510 Rev. AG

Figure 3-42 Calibration Bottle Location

These instructions assume that the carrier gas bottle has
been installed.
Do not connect the low pressure switch directly to the NGC
without a barrier.
Figure
3-44).
Figure
3-43)
Page 3–41

Advertisement

Table of Contents
loading

Table of Contents