Figure 37. Installing the OCP card
Next steps
1
Install the mezzanine
card.
2
Install the sled
into the enclosure.
3
Follow the procedure listed in
System battery
The system battery is used to power the real-time clock of the system.
NOTE:
There is a system battery in each of the sleds.
Replacing system battery
Prerequisites
WARNING:
There is a danger of a new battery exploding if it is incorrectly installed. Replace the battery only with the same or
equivalent type recommended by the manufacturer. For more information, see the safety information that shipped with your
system.
NOTE:
Battery is a Field Replaceable Unit (FRU). Only Dell EMC certified service technicians must remove or install the system
battery.
1
Follow the safety guidelines listed in
2
Follow the procedure listed in
3
Remove the sled
from the enclosure.
4
Remove the expansion card riser
Steps
1
Locate the battery socket. For more information, see
2
Insert a plastic scribe at the negative side of the battery connector and lever the battery up, lift the battery out of the socket.
80
Installing and removing system components
After working inside your
system.
Safety
instructions.
Before working inside your
assembly.
System board
system.
connectors.