Commissioning communication NCK<->Drive
9.3 Commissioning communication NCK<->Drive completed
11. Select the next axis in each case with Axis+ and continue with Step 3 for the next drive.
9.3
Commissioning communication NCK<->Drive completed
Commissioning communication NCK<->PLC completed
You have placed the following in operation:
• PLC
• SINAMICS drives
• Communication NCK-PLC
The basic commissioning is completed. Now you can move the axes.
The next chapter, "Commissioning NCK", describes the parameterization of NCK regarding
the connected machine by setting system variables.
96
CNC Part 1 (NCK, PLC, drive)
Commissioning Manual, 11/2006, 6FC5397-2AP10-2BA0