50 Disassembly and assembly
Removal and installation of
sprocket
Removal
1.
Expand the track shoe assembly. For details,
see Expansion of track shoe assembly.
2.
Swing the work equipment by 90° and push up
the machine with it, and then set blocks [1]
between the track frame and track shoe.
3.Remove the 15 mounting bolts and lift off
sprocket (1).
4
Sprocket: 35 kg
PC130-8
Installation
Carry out installation in the reverse order to
q
1
removal.
[*1]
2
Threads of sprocket mounting bolt:
3
Sprocket mounting bolt:
[*1]
SEN04129-02
Adhesive (LT-2)
323.6 – 362.8 Nm {33 – 37 kgm}
13