Huawei TP48200A-HX09A2 Installation Manual page 43

Hide thumbs Also See for TP48200A-HX09A2:
Table of Contents

Advertisement

TP48200A-HX09A2 & TBC300A-TCA2
Installation Guide
Figure 4-2 Taking the marking-off template
Step 2 Mark the hole positions based on the marking-off template, as shown in
Figure 4-3 Marking hole positions for installing a single cabinet
(1) Marker
(4) Concrete floor
If cabinets are combined, mark hole positions for installing the other cabinet by performing step 3. If
there is only one cabinet, the procedure ends.
Step 3 After marking hole positions for installing the first cabinet, mark hole positions for installing
the other cabinet according to the marking-off template, as shown in
Issue 01 (2013-10-25)
(2) Marking-off template
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Installing Cabinets
Figure
4-3.
(3) Mounting hole
Figure
4-4.
36

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tbc300a-tca2

Table of Contents