Installing Ground Cables - Huawei TP48200A-HX09A2 Installation Manual

Hide thumbs Also See for TP48200A-HX09A2:
Table of Contents

Advertisement

TP48200A-HX09A2 & TBC300A-TCA2
Installation Guide
Installing Ground Cables for Combined Cabinets
Step 1 Route ground cables into the power cabinet through the package entry module in the power
cabinet.
Step 2 Secure ground cables to the ground bar in the power cabinet.
Step 3 Route an equipotential ground cable for cabinet combination into the power cabinet and
battery cabinet through the package entry modules in the cabinets.
Step 4 Connect one end of the equipotential ground cable to the ground bar in the power cabinet, and
the other end to the ground bar in the battery cabinet, as shown in
Issue 01 (2013-10-25)
5

Installing Ground Cables

Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Installing Ground Cables