Mitsubishi Electric 800 Series Instruction Manual page 188

Compact, high functionality inverters
Hide thumbs Also See for 800 Series:
Table of Contents

Advertisement

*3
If the communication option is not installed, switching to the NET operation mode is not possible.
*4
When Pr.551 = "9999", the priority of the PU control source is defined as follows: USB connector > PU connector / Ethernet connector > operation
panel.
9.3 Start command source and frequency command source during communication operation
9. (D) Operation Command and Frequency Command
1
2
3
4
5
6
7
8
9
10
187

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fr-e800

Table of Contents