6.4.2
Example of an axis replacement
Assumption
With 6 axes and 2 channels, the 1st, 2nd, 3rd and 4th axis in channel 1 and the 5th and 6th
axis in channel 2 shall be used. It shall be possible to replace the 2nd axis between the
channels and to allocate to channel 1 after power ON.
Exercise
The task is subdivided into the following areas:
● Machine data allocation so that the prerequisites for axis replacement are given.
● Programming of axis replacement between channel 1 and channel 2.
Fulfillment of preconditions
Population of channel-specific machine data MD20070
$MC_AXCONF_MACHAX_USED[1]=(1, 2, 3, 4, 0, 0, 0, 0)
$MC_AXCONF_MACHAX_USED[2]=(5, 6, 2, 0, 0, 0, 0, 0)
Population of the axis-specific machine data:
MD30550 $MA_AXCONF_ASSIGN_MASTER_CHAN[AX2]=1
Extended Functions
Function Manual, 03/2009, 6FC5397-1BP10-4BA0
Mode Groups, Channels, Axis Replacement (K5)
Axis/spindle replacement
479