Huawei FusionModule1000A40 Maintenance Manual page 10

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A40:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One
Data Center
Maintenance Guide
Issue 04 (2021-02-10)
During fire extinguishing system commissioning, disconnect the solenoid
valve, and insert the fire cylinder safety pin to prevent agent release by
mistake.
Copyright © Huawei Technologies Co., Ltd.
1 Operation and Maintenance Precautions
3

Advertisement

Table of Contents
loading

Table of Contents