Item
Method
Pre-fab.
Check the pre-fab.
module
module exterior for
repainting
damage or corrosion.

3.6 Semi-annual Maintenance

3.6.1 Power Supply and Distribution System

Table 3-13 Semi-annual maintenance checklist for the power supply and distribution system
Item
Method
ATS
Check the ATS
controller display
panel.
Issue 04 (2021-02-10)
Check Standard
The pre-fab.
module and
bases are free
from paint
flake-off, rust, or
corrosion.
Check Standard
The panel
indicator is on.
The display panel
of the controller
displays
information
properly.
Copyright © Huawei Technologies Co., Ltd.
Troubleshooting
Maintain or replace the rusty or
damaged part of the pre-fab. modules.
Repaint areas with paint flake-off or
rust.
Troubleshooting
1. If the panel indicator is off, verify that the
power cable is properly connected, and
reconnect the cable if it is not properly
connected.
2. Replace the ATS by following instructions
in documents delivered with the ATS.
1. If the information is not properly
displayed (fuzzy or blank), verify that the
power cable is properly connected.
2. Replace the ATS by following instructions
in documents delivered with the ATS.