6.1 Routine Maintenance
6.1.1 Monthly Maintenance
Table 6-1 Monthly preventive maintenance table
Maintenance
Area
Power supply and
distribution
system
Issue 02 (2021-06-30)
Maintenance
Operation
Item
Operating status
Check the surge
of the surge
protection
protection module
module indicator
and miniature
circuit breaker
(MCB) status.
Copyright © Huawei Technologies Co., Ltd.
6
Expected Result
Troubleshootin
g
● The surge
● If the surge
protection
module
indicator is
steady green.
● The MCB is
switched on.
● If the MCB is
6 O&M
O&M
protection
module
indicator is
red, replace
the surge
protection
module.