Table 4-4 Components in the cabinet scenario
No.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)

4.1.5 Personnel Requirements

Only trained and qualified personnel who fully understand basic safety
precautions are allowed to install and operate a modular data center.
Huawei will not be liable for any consequence caused by the violation of this
document.
The requirements are as follows:

4.2 Hardware Installation

The angle of door opening by the gas spring is 110°. Ensure that the door opening
angle is less than 110°.
Issue 02 (2021-06-30)
NO TE
If devices such as the VCN, server, and LAN switch are configured, determine their
installation positions based on the site requirements.
CA UTION
Customers' installation personnel must be trained by Huawei and understand
how to install and operate a modular data center.
The number of installation personnel varies based on the project progress and
installation environment. Typically, two to three persons are required.
Copyright © Huawei Technologies Co., Ltd.
Component
ECC800-Pro
PDU5000
UPS
Electronic clasp lock
Lithium battery
3.5 kW integrated air conditioner
Water sensor
Smoke detector
T/H sensor
rPDU
4 Installation Guide
59

Advertisement

Table of Contents
loading

Table of Contents