Huawei FusionModule500 Smart User Manual page 109

Mini data center
Hide thumbs Also See for FusionModule500 Smart:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual (Philippines, FusionModule500-
SU61A12S)
No.
9
10
Cable Installation Check
Table 4-9 Cable installation check items
No.
1
2
3
4
5
6
7
8
Electrical Installation Check
Table 4-10 Electric installation check items
No.
1
2
Issue 02 (2021-06-30)
Check That
All components are properly installed and no
component is left onsite.
Block empty cable holes using plugs or lids.
Check That
All cable joints are secured properly, especially the
cable joints between network cables.
Exposed parts near the wiring terminals and lugs
are wrapped in PVC insulation tape or heat
shrinking tubing.
The flat washers and spring washers of all wiring
terminals are securely installed.
Cables are bound neatly and cable ties are
secured evenly and properly.
Routed cables should be convenient for future
maintenance and expansion.
All labels at the cable ends are clear.
The excess section of a cable strip is cut evenly.
There is no unnecessary adhesive tape or cable tie
on cables.
Check That
All ground cables are copper cables. Cable
diameters are correct. No switches or fuses are
installed on the cables and no short circuit occurs.
The ground cable, AC power cables, and internal
cables are correctly connected and screws are
secured. No short circuit occurs during power
input or output.
Copyright © Huawei Technologies Co., Ltd.
4 Installation Guide
Check Result
□ Passed □ Failed
□ Passed □ Failed
Check Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
Check Result
□ Passed □ Failed
□ Passed □ Failed
100

Advertisement

Table of Contents
loading

Table of Contents