Management System Cable Connection; Connecting Vcn Cables - Huawei FusionModule500 Smart User Manual

Mini data center
Hide thumbs Also See for FusionModule500 Smart:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual (Philippines, FusionModule500-
SU61A12S)
Figure 4-61 Connecting communications cables between lithium batteries and the
UPS
----End

4.3.3 Management System Cable Connection

4.3.3.1 Connecting VCN Cables

Prerequisites
Cables have been prepared.
Procedure
Step 1 Connect one end of the ground cable to the ground terminal on the device and
the other end to the ground point on the cabinet. A Phillips screwdriver and M4
screws are required. The ground cable is a yellow-and-green cable of 16–18 AWG.
The customer needs to prepare the ground cable.
Step 2 Connect one end of the network cable to any GE network port on the VCN.
Issue 02 (2021-06-30)
NO TE
Copyright © Huawei Technologies Co., Ltd.
4 Installation Guide
98