Mechanical Installation: Checklist - Siemens SINAMICS S120 Device Manual

Cabinet modules nema
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Mechanical installation

3.2 Mechanical installation: Checklist

3.2
Mechanical installation: Checklist
Use the following checklist to guide you through the mechanical installation procedure for the
cabinet/transport unit. Read Chapter "Basic safety instructions" before you start working on
the cabinet.
For information on performing the installation, refer to the following sections and the
documents listed in the table below.
Note
Checking the checklist
Check the first box in the column on the right if the action applies to your cabinet unit. In the
same way, check the boxes once you have finished the installation procedure to confirm that
the activities are complete.
Table 3- 1
Mechanical installation: Checklist
Item
Action
1
Check the shipping and handling indicators prior to installation.
(→ See Chapter "Installation/preparation", Section "Shipping and handling indicators")
2
Check the center of gravity label on the cabinet unit.
3
The environmental conditions must be permissible.
(→ See general technical data in Chapter "System overview", Section "System data")
4
The load-carrying capacity and properties of the ground must meet the requirements
for installation of the Cabinet Modules.
(→ See Chapter "Cabinet Modules" in the technical specifications of the respective
Cabinet Modules)
(→ See "Mechanical installation/preparation")
5
The crane transport aids (option M90) installed for delivery must be removed once the
transport unit or individual cabinet units have been set down at the final installation
location.
(→ See Chapter "Installation", Section "Disassembling the crane transport aids")
6
Before the cabinet units are finally installed, the wooden pallets supplied with the
transport unit must be removed properly.
(→ See Chapter "Installation", Section "Lifting from the transport pallet and installing
the cabinet units")
7
The minimum ceiling height (for unobstructed air outlet) must be observed. The cool-
ing air supply and exhaust must not be obstructed and must be available in sufficient
quantity.
(→ See Chapter "Installation", Section "Preparation")
8
The cabinet must be firmly attached to the fixing points provided.
A proper connection must be established if the cabinet units are installed side-by-side.
(→ See Chapter "Installation", Section "Connection for side-by-side installation of cabi-
net units")
46
included/completed?
Cabinet Modules NEMA
Manual, 04/2014, A5E03586450A

Advertisement

Table of Contents
loading

Table of Contents