ABB ACS560 Quick Installation And Start-Up Manual page 17

Standard control program
Hide thumbs Also See for ACS560:
Table of Contents

Advertisement

9. For R3, connect the conductors to the R+ and R- terminals (7c).
10. Tighten to the torque given below.
Frame size
R+, R-
Finalization
Finalization
11. Install the grounding shelf for the control cables (included with the moun
11. Install the grounding shelf for the control cables (included with the mounting screws in
screws in a plastic bag in the delivery) onto the grounding shelf for the p
a plastic bag in the delivery) onto the grounding shelf for the power cables.
cables.
12. Ground the motor cable shield at the motor end. For minimum radio freq
interference, ground the motor cable shield 360 degrees at the lead-thro
the motor terminal box.
8
2.5...4.5
7c
7b
7a
EN - Quick installation and start-up guide 17
R3
N.m
8
lbf.ft
1.8...3.3
EN
HI
Electrical instal

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents