Pioneer PRA-BD11 Service Manual page 63

Sdi aes/ebu input board, sdi aes/ebu output board
Hide thumbs Also See for PRA-BD11:
Table of Contents

Advertisement

5
5. Attach the cable clamp.
Insert the cable clamp (Locking Wire Saddle) supplied with the unit into the specified aperture in the
PRV-LX1 and secure it.
Note:
The mounting location of the PRA-BD11 input board differs from that of the PRA-BD12 output board.
Make sure that they are installed in the correct location.
PRA-BD12 output board
mounting location
6. Bend the two PRV-LX1 FFC cables.
When installing the PRA-BD12 output board, bend both PRV-LX1 FFC cables beyond the reinforced
end section away from the output board at a 90 ° angle relative to the reinforcement to ensure that
they do not bulge and come into contact with the output board. See figure below
Note:
Make sure that the FFC cable is not disconnected from the PRV-LX1 and that the cable is not exposed
to excessive pressure when bent.
FFC cables
5
6
.
Blue reinforced area
PRA-BD11
6
7
PRA-BD11 input board
mounting location
7
8
A
B
C
D
E
F
63
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pra-bd12

Table of Contents