Pioneer PRA-BD11 Service Manual page 66

Sdi aes/ebu input board, sdi aes/ebu output board
Hide thumbs Also See for PRA-BD11:
Table of Contents

Advertisement

1
10. Install the core unit in the PRV-LX1.
The core unit is a component only for the
A
PRA-BD12 output board. To install the
PRA-BD11 input board, go to Step 11.
Thread the FFC cable (L) through the opening
in the core. Install the core unit to the rear
bridge using supplied nylon rivet as shown in
the figure on the right. Then secure the core
using the screw (with washer).
Notes:
B
Press in the nylon rivet until the rivet head is
flush with the surface.
Watch out for sharp edges (on arms and the
rear bridge, for example) when installing the core
unit.
Note:
To prevent load being exerted on the FFC cable
(L) when installing the core unit, place the
core beside the arm recess, then hold the
core unit at an angle (
C
figure) to route the FFC cable as close to the
f connector as possible.
Unlock connector f .
Route the FFC cable (L) through the opening in the
core, insert the cable in connector f and lock by
lowering the stopper . See figure and note below (*).
Note:
Watch out for sharp edges (for example, the arms and the rear bridge)
D
when connecting and routing the FFC cable (L).
E
Unlocked
*
Make sure that the two lines in the reinforcement
are not visible when the connector is locked. If
they are still visible, disconnect and connect the
FFC cable again.
F
66
1
2
angle, as shown in the
Blue reinforced side
(two lines)
Locked
2
3
Screw,
with washer
Core opening
Core
Contact surface
(See Step 4)
FFC cable (L)
FFC cable (L)
PRA-BD12 output board
FFC cable (L)
f
PRA-BD11
3
4
Nylon rivet
Core unit
Rear bridge
Arm recess
PRA-BD12 output board
Core unit
Press in the nylon
rivet until the rivet
head is flush with
the surface.
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pra-bd12

Table of Contents