Group 24: Torque Control
This group defines variables used for torque control operation.
Code Description
2401 TORQ RAMP UP
Defines the torque reference ramp up time – The minimum time for the reference to increase from zero to the
nominal motor torque.
2402 TORQ RAMP DOWN
Defines the torque reference ramp down time – The minimum time for the reference to decrease from the nominal
motor torque to zero.