Remove the lead-through plate from the pedestal:
R7
W2
V2
W1
V1
U1
PE
a
a floor fixing points
Fix the lead-through plate to the floor:
1. Make a hole in the floor or cable conduit cover below the lead-through plate. See
Drawings
2. Check that the floor is horizontal with a spirit level.
3. Fasten the lead-through plate with screws or bolts.
Note: The screws/bolts will be removed and refastened when the pedestal is fastened through the
same holes later on. The lead-through plate can be fastened after leading the cables through it if
the cabling procedure is more convenient in that way.
Lead the power (input, motor and optional brake) cables through the lead-through plate:
1. Make adequate holes in the grommets to fit them tightly on the cables.
2. Lead the cables through the holes and slide the grommets onto the cables.
Busbars connecting the power
cable terminals to the drive
module
U2
These
R-
brackets can
be removed
for the time
of the
installation
a
188
189
on page
and
.
R8
W1
W2
PE
a
Dimension
29
a
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs550-u2Acs550-01Acs550-u1

Table of Contents