Figure 7-13 How To Check 10 Base-T Cables - NEC NEAX 2400 IMX Manual

Fusion network system
Hide thumbs Also See for NEAX 2400 IMX:
Table of Contents

Advertisement

B
HUB-HUB Cable Connection Test
1) Turn ON the MNT switch of the FCH cards which are connected
to the both HUB cards.
2) Make sure that system message (23-W) "FCH Alternate Routing
(start)" is displayed for each FCH.
3) Turn ON the MB key on the both HUB cards.
4) Unplug and plug the modular connector a few times at each conne-
ctor since the connection may be a poor contact.
5) If the above procedure does not result in normal operation, perform
the conductive test of the 10 BASE-T cable.
HUB (PA-M96)
: 10 BASE-T cable
C
HUB-LANI Cable Connection Test
1) Turn ON the MNT3 switch of the FCH cards which are connected
to the both HUB cards.
2) Make sure that system message (23-W) "FCH Alternate Routing (start)"
is displayed for each FCH.
3) Turn ON the MB key on the HUB card.
4) Unplug and plug the modular connector a few times at each connector
since the connection may be a poor contact.
5) If the above procedure does not result in normal operation, perform the
conductive test of the 10 BASE-T cable.
When a HUB card is placed in make-busy, all BASE-T interfaces connected to the
WARNING:
HUB card become inoperative.
FCH (PA-FCHA)
HUB (PA-M96)
MB
MB
B
C

Figure 7-13 How to Check 10 BASE-T Cables

ND-70185 (E)
Get other manuals https://www.bkmanuals.com
23-S FCH Failure Notification (Detection)
DTI(PA-24DTR)
MB
MB
MNT 3
MNT
modular
connector
A
HUB - FCH Cable Connection Test
1) Turn ON the MNT 3 switch on the FCH card. (make-busy-request)
2) Make sure that system message (23-W) "FCH
Alternate Routing (start)" is displayed.
3) Turn ON the MB key on the FCH card.(make-busy)
A
4) Turn ON the MB key on the HUB card.(make-busy)
5) Unplug and plug the modular connector a few
times at each connector since the connection may
be a poor contact.
6) If the above procedure does not result in normal operation,
to LANI
perform the conductive test of the 10 BASE-T cable.
(PZ-PC19)
modular
connector
10 BASE-T
Unplug and plug the modular connector
TROUBLESHOOTING
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
OPE
MB
2
CHAPTER 7
Page 157
Revision 3.0

Advertisement

Table of Contents
loading

Table of Contents