HP Metal Jet S100 User Manual page 31

Powder management station
Hide thumbs Also See for Metal Jet S100:
Table of Contents

Advertisement

4.
If the printer has not yet been registered, you will be asked to add your HP certified partner name,
which makes it easier to help you.
5.
The front panel asks you to fill in the Certificate of Installation form. When you click the Certificate
of Information link, a Web-based form appears, on which you should answer all the questions.
This Certificate of Installation step is mandatory for every new printer installation. If you are
reinstalling the Command Center, or if the printer's Certificate of Installation was filled in before,
this step can be skipped.
The name of the new printer should appear on the list of printers.
HP SmartStream 3D Build Manager
Use the powerful 3D print-preparation capabilities of HP SmartStream 3D Build Manager to help make
all of your 3D printing jobs successful:
1.
Add parts to begin preparing the print job.
2.
Rotate, size, and position the part on the bed.
3.
Automatically locate and fix 3D geometry errors.
4.
Send a printer-ready file to a connected 3D printer or save the printable file.
You can find more information about the Build Manager in the
Guide .
Printing without an HP Cloud connection
If the printer is not connected to the HP Cloud, it will have a maximum of six credits to print.
A single print uses one credit. A multi-profile build-on-build print uses one credit per build; however, if
there are not enough credits, the print is allowed to run to completion anyway.
For example, if you want to print a four-profile build-on-build print with six credits remaining, it will take
four credits and there will be two remaining.
However, if you want to print a four-profile build-on-build print with one credit remaining, you can do so,
and there will be no credits remaining.
When there are no credits remaining, you cannot print until the printer is reconnected to the HP Cloud.
Accessories
These accessories are not included in your purchase of the powder management station. If purchased,
they should be used when operating the station, and in conjunction with each cycle.
They are intended to receive daily use and should be inspected daily to ensure that no accessory has
been damaged.
Material-handling tools
Used to remove printed parts from the build unit and recycling material. See the site preparation guide.
HP SmartStream 3D Build Manager User
HP SmartStream 3D Build Manager
27

Advertisement

Table of Contents
loading

Table of Contents