HP Metal Jet S100 User Manual page 69

Powder management station
Hide thumbs Also See for Metal Jet S100:
Table of Contents

Advertisement

Once a month
Maintenance operation
Clean the mixer lid area on page 80
Once a year
Maintenance operation
Replace the sieve inlet filter (791A0A) on page 80
Check the station's Residual Current Circuit Breakers on page 84
Check the earthing on page 86
When required
Maintenance operation
st
1
stage material trap inspection on page 90
T-pipe box inspection on page 88
Clean the vacuum system pre-filter on page 92
Replace the vacuum system pre-filter (5S375A) on page 95
Replace the vacuum system HEPA filter (5S376A) on page 95
Clean the sieve mesh waste on page 99
Maintenance operations
The customer is required to take safety and security measures (such as wearing personal protective
equipment) when directly exposed to material (in powder or solid state before sintering). See the
material's safety data sheet for more information.
Before every job
Clean the coarse area
CONTENT TBD
Once a day
Clean the working area
Before you start to clean the Build Unit, ensure that the refiller cover is in place and locked. Afterwards
ensure that you remove it.
Tools
Tools
Filter, vacuum cleaner, screwdriver
Multimeter
Vacuum cleaner, screwdriver
Tools
Vacuum cleaner
Filter, vacuum cleaner
Filter, vacuum cleaner
Vacuum cleaner
Maintenance operations
65

Advertisement

Table of Contents
loading

Table of Contents