9-26 Upgrading Your Server
8.
Install the PCI retention springs removed in step 5.
9.
Push the tabs of the PCI board retention springs one by one to make them contact with the
rear of the server.
A click occurs to lock each of the tabs.
10.
Assemble the server.
11.
Turn on the power of the server. Make sure that no error message appears in the POST.
If an error message appears, write down the message and contact the maintenance service
agent for the maintenance.
Insert claw.
Insert claw.