8. Connect the other antenna to the Connectorized PTP 300 Series bridge.
9. Disconnect the cable to the already aligned antenna.
10. Align the second antenna using the tones as described in Section 6.6.1 "Aligning the
PTP 300 Series Bridge ODUs".
11. Re-connect the second antenna to the Connectorized PTP 300 Series bridge. You
will notice the tone pitch increase as you re-connect the second antenna due to the
additional received signal.
12. Use the relevant status web pages to check that you are getting the results you
expect from your link planning.
13. Complete the installation as detailed below.

10.7.9 Completing the Installation

The installation should be completed by checking all mounting nuts bolts and screws,
securing all cables and weatherproofing the installation.
CAUTION
Finally tightening the antenna mountings may cause the antenna alignment to be
altered, due to distortion in the mounting bracket caused by action of tightening. It is
recommended that the installation tone be left turned on (armed) during this process
so that any movement can be noticed and counteracted by tightening the other side
of the bracket.
10.7.10

Antenna Cable Fixing

Cables should be secured in place using cable ties, cleats or PVC tape. Care should be
taken to ensure that no undue strain is placed on the connectors on both the Connectorized
PTP 300 Series bridge and the Antennas and also to ensure that the cables do not flap in the
wind. Flapping cables are prone to damage and induce unwanted vibrations in the mast to
which the units are attached.
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299
10 Connectorized PTP 300 Series Bridge
183

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ptp 500 series

Table of Contents