5 Lightning Protection
5.2
LPU Detailed Installation
The Lightning protection Unit should be mounted at the building entry point and must be
grounded (Figure 14).
Figure 14 – PTP LPU Installation Example for PTP 300 Series (Not to Scale)
42
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299