Installing The Battery Backup Unit Into The Bbu Carrier - Fujitsu Celsius C620 Operation Manual

Hide thumbs Also See for Celsius C620:
Table of Contents

Advertisement

System expansion

Installing the battery backup unit into the BBU carrier

Note the locations of the three bolts (circled in the illustration below) for the correct position
i
for installation of the BBU.
Insert the BBU at a slight angle under the right-hand retaining clamp on the BBU carrier (1).
Fold the BBU down until you feel it latch into place (2).
90
Fujitsu Technology Solutions

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents