ACS550 User's Manual
Wiring with Conduit
1. Open the appropriate knockouts in the
conduit/gland box. (See "Conduit/Gland Kit"
above.)
2. Install thin-wall conduit clamps (not supplied).
3. Install conduit/gland box.
4. Connect conduit runs to box.
5. Route input power and motor wiring through
conduits.
6. Strip wires.
7. Connect power, motor, and ground wires to
the drive terminals. See "Power Connections"
on page 20.
8. Route the control cable through the conduit.
9. Strip the control cable sheathing and twist the
copper screen into a pig-tail.
10. Connect the ground screen pig-tail for digital
and analog I/O cables at X1-1.
11. Connect the ground screen pig-tail for RS485
cables at X1-28 or X1-32.
12. Strip and connect the individual control wires
to the drive terminals. See "Control
Connections" on page 20.
13. Install the conduit/gland box cover (1 screw).
2
3
7
7
5
4
10
12
8