Installation Checklist; What This Chapter Contains - ABB ACS800 Hardware Manual

Hide thumbs Also See for ACS800:
Table of Contents

Advertisement

Installation checklist

What this chapter contains

This chapter contains an installation checklist.
Installation checklist
Check the mechanical and electrical installation of the drive before start-up. Go
through the checklist below together with another person.
WARNING! Only qualified electricians are allowed to commission the drive. Read
and follow the
safety instructions can cause injury or death.
Check...
MECHANICAL INSTALLATION
The ambient operating conditions are allowed. (See
The unit is fixed properly on a vertical non-flammable wall. (See
The cooling air will flow freely.
The motor and the driven equipment are ready for start. (See
installation: Motor selection and compatibility, Technical
ELECTRICAL INSTALLATION (See
The +E202 and +E200 EMC filter capacitors are disconnected if the drive is connected to an
IT (ungrounded) system.
The capacitors are reformed if stored over one year (refer to ACS 600/800 Capacitor
Reforming Guide [64059629 (English)].
The drive is grounded properly.
The mains (input power) voltage matches the drive nominal input voltage.
The mains (input power) connections at U1, V1 and W1 and their tightening torques are OK.
Appropriate mains (input power) fuses and disconnector are installed.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
Safety instructions
on the first pages of this manual. Ignoring the
Planning the electrical installation, Electrical
Mechanical installation, Technical
Mechanical
Planning the electrical
data:
Motor
connection.)
83
data)
installation.)
installation.)
Installation checklist

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-31Acs800-u31

Table of Contents